Chippewa Valley Electric Cooperative - Electric Vehicle Charging Station Rebate

Program Chippewa Valley Electric Cooperative - Electric Vehicle Charging Station Rebate
Category Financial Incentive
Implementing sector Utility
Last Update
State Wisconsin
Administrator Chippewa Valley Electric Cooperative
Website https://www.cvecoop.com/rebates.php
Sectors Residential

Electric Vehicle Charging Station and Additional Rebates

  • $400 - Electric Vehicle Charging station (must be on load control)
  • $800 - Smart Electric Vehicle Charging Station with integrated metering (must be on load control)
  • $11 - Faucet flow restrictor, shower flow restrictor, and smart power strip 

Eligibility

  • New equipment must be installed on cooperative’s lines. 
  • Incentive not to exceed the equipment cost. 
  • Incentives are in place through December 31, 2021. Funds are limited so submit required documentation as soon as possible. 
  • Required documentation must be submitted within 3 months of purchase date for flow restrictor or smart WiFi power strip, and within 3 months of install date for EV charging station. If submitted after December 31, 2021, equipment will be considered for the 2022 incentive if offered.   
  • Required documentation listed below must be submitted no later than 3 months after purchase date for flow restrictor or smart WiFi power strip, and no later than 3 months after install date for electric vehicle charging station.

Required Documentation

  • This incentive form
  • A copy of your receipt or invoice for each item with purchase price(s) circled   
  • For EV charging station, include documentation showing the station has been installed 

Add new comment